In 2023, Dalia purchased the Eshkol power plant from the IEC as part of the structural reform according to which the Israel Electric Corporation undertook to sell five power plants to the private sector.
The Eshkol power plant was purchased for a total of NIS 9 billion, and it is the largest plant in Israel powered by natural gas. The station operates two combine cycle turbines with a production capacity of 1606 megawatts. In addition, the station has four old steam generating units that are intended for scrapping within a few years.
The Eshkol complex covers 425 dunams (about 110 acres) intended for significant development of the electricity sector, including the construction of the modern and efficient Eshkol II power plant – Avshal – with a production capacity of 850 megawatts, as well as large energy storage facilities.
Eshkol in a New Light
In January 2026, Dalia launched the "Eshkol in a New Light" project – a dynamic artistic illumination of the station's chimneys. For the company's management this is a symbolic gesture expressing its respect for the site's heritage, along with the aspiration for building a cleaner and more advanced energy future. The illuminated chimneys symbolize a delicate balance between protecting the environment, the heritage and the people and building a more advanced, efficient and safer energy future for the State of Israel.
Eshkol Avshal is a new power plant with a production capacity of 850 megawatts, based on H-Class technology, which is an advanced generation of heavy-duty gas turbines intended for conventional power plants powered by natural gas with an energy efficiency of 64%. The new H-Class power plant will replace the old steam units and dramatically reduce the intensity of emissions compared to the old plant, which will also help significantly improve the quality of the environment for the residents of the area. The new power station will be named Avshal, after Avshalom Haran, a director at Dalia, who was brutally murdered on October 7, 2023 in Kibbutz Be'eri.
The estimated cost of the construction of the plant is approximately NIS 3.3 billion. The expected commercial operation date is in the second quarter of 2029.
Communications hub and data center as a leading technological focal point in Israel
Located within the Eshkol complex, Dalia Data Power (DDP) serves as an international communications hub and one of Israel’s largest data centers, with a capacity of approximately 250 megawatts.
Dalia Data Power holds a license from the Ministry of Communications to operate a landing station for an international subsea optic cable.
Dalia Data Power bridges the worlds of energy and technology by providing reliable electricity and data center infrastructure that enable the growth of cloud services, artificial intelligence, and future technologies.
The international communications hub connects Israel to major communication sites in Europe via a subsea cable. In addition, it will be connected to Aqaba through a redundant infrastructure, providing access to communication hubs in the Gulf states and the Far East.
The communications hub and server farm will be constructed on an area of 50 dunams (about 12 acres) and are expected to benefit from the unique advantages of the Eshkol complex.
• Direct and stable optical service – physical proximity to power plants allows for a high-power direct connection, independent of the congested transmission infrastructure of the national power grid.
• Seawater cooling – the proximity to the sea allows for natural and efficient cooling of the server farms, an ecological solution that significantly reduces the energy consumption required for cooling.
• Managed optical communication service (MOFN) connecting major data centers in Europe and the Middle East via subsea cable infrastructure, featuring a direct route, low latency, and redundant paths.
• Available areas – large real estate areas suitable for commerce and advanced industries in the region.